30532 Ono North Loop West New Construction Custom Home For Sale | Steven Crim Athlon Investments, LLC
No listings were found matching your search criteria.
New Construction Listing on Ono Island: 30532 Ono North Loop West
Introducing 30532 Ono North Loop West, Lot 167, on Ono Island — a custom new-construction residence by Steven Crim, Athlon Investments, LLC.
This property is located on a quiet street in the heart of Ono North, just around the corner from the Ono Island Rec Center and boat launch. It’s a perfect location for those who want the security, amenities, and lifestyle that make Ono Island one of the most sought-after private communities on the Gulf Coast.
Jump To Construction Update
Exceptional Quality & Craftsmanship
This home will be built to Gold Fortified standards, offering strength, security, and long-term value. Steven Crim and his team are known for their attention to detail, and this residence is no exception. Every element of the design reflects coastal contemporary style with thoughtful finishes and efficient use of space.
With 5 bedrooms, 3.5 bathrooms, and a three-car garage, the floor plan combines both functionality and elegance. The chef’s kitchen features a large quartz island, walk-in pantry, and premium appliances — perfect for everyday living and entertaining.
The private primary suite is designed as a retreat. You’ll find a spa-inspired bath with double vanities, soaking tub, and walk-in shower, along with a custom walk-in closet complete with an island and in-wall safe.
Ono Island Lifestyle
Living on Ono Island means access to a gated community with 24-hour security, a private boat launch, tennis and pickleball courts, clubhouse, fitness center, and both indoor and outdoor pools. From boating on Bayou St. John to enjoying sunsets from your own street, this is island living at its best.
30532 Ono North Loop West, Orange Beach, AL 36561
Approx. 2,680 sq. ft. | Lot Size: 80 x 248
Contact Meredith for details about 30532 Ono North Loop West and new construction opportunities on Ono Island.
Click Here To View Videos
Construction Update: Lot 167 Ono North Loop West
Click Here To View May Updates
Click Here To View March Updates
March 21:

Click Here to View January and February Updates
Treated, Wire, Plastic. Prep for Concrete Pour. March 7, 2026:
Plumbing Inspection Passed February 24, 2026:





