If you’re dreaming of a waterfront lifestyle on Ono Island in Orange Beach, Alabama, and envisioning your own private pier or boathouse, it’s essential to understand the detailed rules, permitting process, and coastal realities that come with building over water. As a homeowner and real estate advisor here on Ono Island, I can help guide buyers through this process—from dock designs to working with the ACC and Army Corps of Engineers.
Here’s my complete guide to help you navigate everything you need to know.
The Property Owners Association (POA) and Architectural Control Committee (ACC) oversee pier and boathouse construction approvals. You must submit detailed plans for their review and approval before starting construction.
Federal permits are often required for structures extending into navigable waterways like Bayou St. John or the Intracoastal Waterway. These take time—plan for 60–120 days, depending on complexity.
Local permits may also be required, including stormwater and site impact evaluations. Always coordinate with licensed contractors familiar with coastal builds.
Each type of waterfront lot has different restrictions:
Typically 40 feet wide
One dock/boathouse structure permitted per lot
Setback: Must maintain 15 feet from side property lines (extended into the water)
Max Intrusion: No more than 15 feet into the canal from centerline
Structure Width: Max 4 feet for walkways/pier
Seagrass Protection: Cannot build within 12 inches of the underwater grass fringe
Floating Docks Prohibited
Bond Required: A $2,000 marsh grass bond is collected and held until approved restoration is complete by the Corps
“Canal construction must maintain navigability,” says the ACC. “A 30-foot-wide channel must be left clear in every canal for safe boat travel.”
Typically allow larger boathouses and longer piers, depending on water depth
Must apply for Army Corps of Engineers permit
Boat lifts may be installed but are subject to location and spacing limits
Setbacks may vary, especially if adjacent to environmentally sensitive areas
Roof Material/Color: Must match the roof of the main residence (or vice versa if built first)
Roof Pitch: Suggested 4:12 slope
Height Limit: 16.5 feet from mean high water line to top of safety rail if using sundeck
Sundeck: Permitted as a flat roof with railings, but no additional roof can be built above it
Drop-down Sides: Allowed up to 24 inches (counted in total structure footprint)
No Vertical Storage Closets: Only overhead storage and dock boxes permitted
No Fish Cleaning Stations: Strictly prohibited
Prohibited. Boathouses cannot be used for living space or overnight use.
Water and Power: May be installed with proper permitting and inspections
Lighting: Should be subtle and neighbor-conscious
As the ACC notes, “All improvements must preserve the natural aesthetics of Ono Island’s waterways and minimize disruption to living shorelines.”
Generally, one lift is permitted per canal lot, and additional lifts (for jet skis, etc.) may be allowed if they do not exceed space or encroach upon setbacks.
Canal Lots: Suitable for boats with shallow to moderate drafts; most center consoles, bay boats, and pontoons are ideal
Old River / Bayou St. John Lots: Can often accommodate larger vessels up to 35+ feet
Depths: Canal depths vary but are maintained for navigability. Dredging requires separate permitting and is rarely allowed on private initiative.
“Draft depths change with tides and rain. It’s always wise to work with a contractor who’s built boathouses here before,” shared one longtime Ono builder.
Floating docks
Fish cleaning tables
Living space in or over boathouses
Multiple docks that impede navigation
Cutting grass along the canal banks within 2 feet
Construction on islands or mounds within canal systems
Design with a Local Marine Contractor – Choose one who understands Ono Island rules.
Submit to ACC – Include plans, elevations, and color materials.
Apply for Army Corps of Engineers Permit (if applicable)
Pay Grass Bond ($2,000) for canal lots
Get POA and County Approvals
Schedule Inspections
Maintain Compliance – Be mindful of vegetation and neighbors’ views
“We encourage all homeowners to engage early and ask questions. We’re here to protect the beauty of Ono Island,” notes the ACC.
Navigating the process of building a pier or boathouse on Ono Island can feel overwhelming—but with the right guidance and a team that understands the unique ecosystem and rules, it can be a smooth and rewarding experience. I’d be honored to help you every step of the way—whether it's choosing a lot with the right depth and orientation or walking you through the ACC and permitting maze.
If you’re considering building on Ono Island or want to evaluate the potential of a waterfront lot, let’s talk. As a homeowner and advisor here, I offer firsthand insight and access to a network of trusted professionals who do it right the first time.
Explore More Ono Island Listings Here
Read More About Ono Island Living
#searchthegulf #meredithamon #becausewelivehere
The Six Northern Canals of Ono Island: A Waterfront Guide to Bayou St. John
By Meredith Folger Amon — Licensed in Alabama and Florida
At first light, the northern edge of Ono Island — https://www.searchthegulf.com/ono-island/ glows soft and still. The mirror-like surface of Bayou St. John ripples only…
When it comes to finding the home of your dreams in a fast-paced market, knowing about new listings as soon as they are available is part of our competitive advantage.Sign up to see new listings in an area or specific community. Contact Meredith with any questions you may have.