May Construction Update: Lot 167 Ono North Loop West
May 23: Brick has been painted
May 18th:
The metal roof is in place, the windows have been installed, the home is wrapped with a protective weather barrier, and the brickwork is now underway along the base of the exterior.
This is the point in construction where buyers can begin to see the design, durability, and coastal intention behind the home. The rooflines are defined, the window placement is clear, and the exterior envelope is beginning to come together before the final siding, trim, and finish details are added.
A well-built coastal home is not just about what you see when it is complete. It is about the thoughtful layers behind the finished product.
For buyers considering new construction on Ono Island, this is one of the most informative phases to observe.
May 11th:
The walls and ceiling are open, allowing buyers to see the wood framing, roof structure, electrical wiring, window placement, exterior sheathing, and the way the rooms are beginning to take shape before insulation and drywall are installed. Large windows and doors are already in place, giving a preview of the natural light and indoor-outdoor flow that will become a major feature of the finished home











May 5th. Metal Roof Installation